Key takeaways
- Move vehicles, grills and patio items away from the house.
- Protect attic contents and wall hangings from vibration.
- Plan for pets and children during tear-off.
- Agree on access, schedule and clean-up before the first day.
Around the house
Move cars out of the driveway, clear the area around the foundation and move patio furniture, grills and planters. Cover or relocate items near the walls, and mark sprinkler heads and landscape lights.
Trim tree limbs that hang over the roof if you can do it safely, so crews have clear access.
Inside the house
Tear-off can shake the house. Take down mirrors and wall hangings on upper floors, and cover attic items with tarps or plastic since dust can fall through the decking.
Plan for noise, especially if someone works from home, naps or has pets that get anxious.
The schedule
Most homes take one to three working days, depending on size, pitch, materials and weather. A good crew checks the forecast, and if rain is coming, dries in the roof before leaving.
Agree on start time, where the dumpster or trailer will go and who the on-site contact is.
The finish
Crews should sweep the yard and driveway with a magnet to pick up nails. Walk the property afterward and look at the gutters, flashing and ridge with your project manager.
Ask for photos of the finished roof and any hidden repairs, such as replaced decking.
Quick answers
Do I need to be home during the replacement?
It is not required, but it helps to be reachable in case a question comes up about decking or details.
What if it rains during the project?
A good crew dries in the roof with underlayment and tarps and finishes when the weather clears.
How do I protect my landscaping?
Cover shrubs near the walls if you can, and ask the crew to tarp plants and use a magnet sweeper afterward.